The principle of blended level signalling is predicated on uncomplicated ideas employing bi-directional details exchange between the Radio Block Centre (RBC) and the interlocking systems. The operator sets a route and will not need to have to grasp When the route will likely be employed for a Level NTC (former LSTM) only or maybe a Level two-Geared